High Precision CNC Machining Dump Truck Spur Gears
HK AA Industrial Co., Limited- Application:Industry
- Hardness:Hardened
- Manufacturing Method:Sintered Gear
- Toothed Portion Shape:Spur Gear
- Material:Stainless Steel
- Type:Circular Gear
Base Info
- Model NO.:HK AA-0204
- Brand Name:HK AA
- Category:Spur Gear
- Standard or Nonstandard:Nostandard
- Micro Machining or Not:Micro Machining
- Descriptions:High Precision CNC Machining Dump Truck Spur Gears
- Process:Polishing Grinding Machine Parts Ground Steel
- Package:Polybag+Carton
- Delivery Time:10-25 for Samples;20-35 for Batch Goods
- Manipulate Way:Forced Manipulation
- Changes Way:Stepped
- Transport Package:Standard Export Carton, Inner: PP Bubble Bag
- Specification:ISO9001-2008 SGS IAF
- Trademark:HK AA
- Origin:Guangdong China
- HS Code:7318160000
- Production Capacity:20, 000,Month
Description
Product Name
High Precision CNC Machining Dump Truck Spur Gears
Turning, deep stamping, bending, punching, threading,welding, tapping, riveting
Material
Black derlin, POM, Aluminum, copper, brass, stainless steel, steel, iron, alloy, zinc etc.
spraying, the heat disposing, hot-dip galvanizing, black oxide coating, painting,
powdering, color zinc-plated, blue black zinc-plated, rust preventive oil, titanium alloy
galvanized, silver plating, plastic, electroplating, anodizing etc.
washer,gasket,plastic molding injection parts,standoff,CNC machining service,
accessories etc.
ISO9001 - 2008
RoHS, SGS, Material Certification
Main markets
North America, South America, Eastern Europe , West Europe , North Europe, South Europe, Asia
Quality Control
Conducted by ISO9001-2008 SGS IAF,etc
mechanical equipment, daily living equipment, electronic sports equipment,
light industry products, sanitation machinery, market/ hotel equipment supplies,
artware etc.
File Format
Solidworks,Pro/Engineer,Auto CAD,PDF,JPG
Service
Inspection
IQC, IPQC,FQC,QA
Other GEARS for your look,
Company Information
HK AA Industrial Co,. Limited, is located in NO 4 Building, Jinlong Industrial Zone Longjiang Road, Xiekeng, Qingxi, Dongguan, Guangdong province, China. HK AA was founded in 1998, covering an area of 11,000 square meters and 200 workers . 90% of our products are sold to overseas market such as USA, Canada, Germany, UK, Italy, Australia, Japan, South Korea etc. We are ISO 9001:2008, ISO13485 (medical)and TS16949(automotive) certified company. We will have AS9100 certificate(aerospace) In 2018.
FAQ
Q1: How to guarantee the Quality of Industrial Parts?
A1: we are ISO 9001-2008 certified firm. we have the integrated system for industrial parts quality control. We have IQC (incoming quality control), IPQCS (in process quality control section), FQC (final quality control) and OQC (out-going quality control) to control each process of industrial parts prodution.
Q2: What's the Advantage of Your Parts for Industry Products?
A2: Our advantage is the competitive prices, fast delivery and high quality. Our employees are responsible-oriented, friendly-oriented, and dilient-oriented. our Industrial parts products are featured by strict tolerance, smooth finish and long-life performance.
Q3: what are our machining equipmengts?
A3: Our machining equipments include CNC milling machines, CNC turning machines, stamping
machines, hobbing machines, automatic lathe machines, tapping machines, grinding machines,
screw machines, cutting machines and so on.
Q4: What shipping ways our use?
A4: Generally speaking, we will use UPS or DHL to ship the products. Our customers can reach the
products within 3 days. If our customers do not need them urgently, we will also use FedEx and TNT. If the products are of heavy weight and large volumn, we will ship them by sea. This way can save
our customers a lot of money.
Q5: Who are our main customers?
A5: HP, Samsung, Jabil Group, Lexmark, Flextronic Group.
Q6: What materials can you handle?
A6: Brass, bronze, copper, stainless steel, steel, aluminum, titanium And plastic.
Q7: How Long is the Delivery for Your Industrial Part?
A7: Generally speaking, it will take us 15 working days for machining parts and 25 working days for
the for stamping parts products. But we will shorten our lead time according to customers' demands
if we are able to.