Power Transmission Parts

European Standard Cast Iron Groove V Belt Sheave Pulley with Taper Bushing

NINGBO HIPOWER TRANSMISSION CO., LTD.
  • Certification:CE, ISO
  • Pulley Sizes:Type A
  • Manufacturing Process:Casting
  • Material:Iron
  • Surface Treatment:Phosphating
  • Application:Chemical Industry, Grain Transport, Mining Transport, Power Plant

Base Info

  • Model NO.:SPB160-3 * 2517-50
  • Transport Package:Neutral Packing
  • Specification:SPZ, SPA, SPB, SPC
  • Trademark:GPBELT,SKYLINE
  • Origin:China
  • HS Code:84390000
  • Production Capacity:5000PCS,Day

Description

Basic Info.

Model NO. SPB160-3 * 2517-50 Transport Package Neutral Packing Specification SPZ, SPA, SPB, SPC Trademark GPBELT/SKYLINE Origin China HS Code 84390000 Production Capacity 5000PCS/Day

Product Description

V PULLEY

Production Information:

1. European Standard: SPZ, SPA, SPB, SPC, Up to 10 Grooves, with Taper Bushing

2. American Standard:

. Sheaves 3V, 5V, 8V with Taper Bushing, QD Bushing, Split Taper Bushing

. Sheaves AK, AKH, BK, BKH with Taper Bushing for 3L, 4L,, A, B Belt. 

. Sheaves A, B, C, D, E with Metric Size System

Surface Treatment Option: Paint, Phosphating, Zinc-Plated

Material: Cast Iron, Dustile Iron, Aluminum

Customerized according to drawing or sample, OEM


 Catalogue

V Pulley for European Standard

European Standard Cast Iron Groove V Belt Sheave Pulley with Taper Bushing
European Standard Cast Iron Groove V Belt Sheave Pulley with Taper Bushing

European Standard Cast Iron Groove V Belt Sheave Pulley with Taper Bushing

European Standard Cast Iron Groove V Belt Sheave Pulley with Taper Bushing

American Standard

European Standard Cast Iron Groove V Belt Sheave Pulley with Taper Bushing

European Standard Cast Iron Groove V Belt Sheave Pulley with Taper Bushing

Packing and Delivery 

European Standard Cast Iron Groove V Belt Sheave Pulley with Taper Bushing

European Standard Cast Iron Groove V Belt Sheave Pulley with Taper Bushing

FAQ

1. Can I get any sample ? 
Samples are free to be available, if there is any in stock. But you have to absorb the relative courier fee.


2. How long is the delivery time for the production?
Production lead time is 30-60 days for the production.

3. What's your advantage?
Competitive price, good quality, high-experience engineers abailable, professional service.